Bituminous prime coat or tack coat material for a paved area from its application rate.

Inputs

gal/yd²
%

Result appears here

Fill in the fields and press Calculate.

Formula, calculation, assumptions and sources

Total material (gal) = Area (yd²) × Application rate (gal/yd²)

Run the calculation to see each step with your own numbers.

About the Bituminous Prime & Tack Coat Calculator

The Bituminous Prime & Tack Coat Calculator turns a paved area and an application rate into the total bituminous material needed, for either a prime coat (applied to a granular base before the first asphalt lift) or a tack coat (a thin bonding layer between two asphalt lifts). Both are the same area-times-rate calculation — this one tool covers both so the site doesn't carry two near-identical pages. Application rate is entered directly in gal/yd² (the unit state DOT and Asphalt Institute MS-19 specifications use), matching how a project's specified rate is normally given; the total quantity output converts properly between US gallons and litres.

What you enter

  • Area to treat
  • Coat type
  • Application rate — Typical residual rates: prime coat 0.25–0.50 gal/yd² (FHWA/Asphalt Institute MS-19); tack coat 0.03–0.10 gal/yd² residual (state-DOT specs — undiluted emulsion applies more before it breaks). Use the rate specified for your project.
  • Waste allowance — Default 5%. Adjust to your own allowance — the exact figure is always shown too.

What you get back

  • Total bituminous material — Rate entered in gal/yd² (US practice); this total converts properly to litres.

The formula, a worked example, the assumptions behind it and the sources are shown in full below the calculator.

Related calculators