Skip to content
BuildFactor

Plastering Calculator

Plaster (render) volume, plus cement bags and sand, for a wall or ceiling area from its thickness and mix ratio.

Inputs

%

Result appears here

Fill in the fields and press Calculate.

Formula, calculation, assumptions and sources

Wet plaster volume = Area × Thickness

Dry volume = Wet volume × 1.27

Cement volume = Dry volume × cement-part ÷ (cement-part + sand-part); bags = cement volume × 1,440 kg/m³ ÷ 50

Sand volume = Dry volume × sand-part ÷ (cement-part + sand-part)

Run the calculation to see each step with your own numbers.

About the Plastering Calculator

The Plastering Calculator works out the plaster (render) volume for a wall or ceiling, then splits it into cement bags and sand using a site-mix ratio, the same way a mason batches by volume on site. It uses a 1.27 dry-volume factor — lower than concrete's 1.54 because plaster mortar has no coarse aggregate — to account for the voids that close up once water is added. For laying brick or block rather than finishing it, use the Mortar Calculator; for a full cement/sand/aggregate concrete mix, the Cement Calculator.

What you enter

  • Wall or ceiling area
  • Plaster thickness — 12 mm (½ in) is typical for a single coat; 15–20 mm for a two-coat external render.
  • Mix ratio (cement : sand)
  • Waste allowance — Default 10%. Adjust to your own allowance — the exact figure is always shown too.

What you get back

  • Plaster volume (wet) — shown as the exact figure and, separately, a recommended figure with your waste allowance added.
  • Cement (50 kg bags) — shown as the exact figure and, separately, a recommended figure with your waste allowance added.
  • Sand — shown as the exact figure and, separately, a recommended figure with your waste allowance added.

The formula, a worked example, the assumptions behind it and the sources are shown in full below the calculator.

Related calculators

Part of the Masonry calculators.